Documents

Draft Alternatives

Review the ALternatives Briefing Book that addresses multiple strategies for the Plan Area here.

Policy Documents

Mountain View General Plan
Provides the broad direction for the development of the Precise Plan

  • Land Use and Design
    City-wide land use policies, development densities and intensities, and a list of appropriate land uses
  • Mobility
    City-wide policies related to transportation
  • El Camino Real Change Area
    Land use policies, development densities and intensities, and appropriate land uses for the El Camino Real Change Area

Greenhouse Gas Reduction Plan
Contains a baseline community-wide greenhouse gas (GHG) emissions inventory, emissions projections, GHG reduction targets and strategies, and a monitoring program.

Mountain View Housing Element
Comprehensive and long-term plan for addressing city-wide housing needs.

Precise Plan Meeting Documents
Date Topic Links
City Council 9/23/2014 Review of the Precise Plan Public Draft Meeting Packet
EPC 8/28/2014 Review of the Precise Plan Public Draft Meeting Packet
City Council 5/20/2014 Discussion of Draft El Camino Real Precise Plan Components Meeting Packet
EPC 4/2/2014 Study session to provide input on the El Camino Precise Plan draft principles, standards, and development prototypes Meeting Packet
City Council 2/4/2014 San Antonio Precise Plan Draft Alternatives, El Camino Real Precise Plan Strategies and Options Meeting Packet
EPC 1/22/2014 San Antonio Precise Plan Draft Alternatives, El Camino Real Precise Plan Strategies and Options Meeting Packet
Community Workshop 1/11/2014 San Antonio Precise Plan and El Camino Real Precise Plan Update Meeting Packet
City Council (CC) – 10/15/2013 Alternatives Direction Staff Report
El Camino Real Corridor Advisory Group (CAG) – 10/7/2013 Introduction, Issues and Opportunities Meeting Packet
Meeting Notes (See Attachment 5)
Bicycle/Pedestrian Advisory Committee (B/PAC) – 9/26/2013 Bicycle/Pedestrian Conditions Staff Report
Meeting Notes (See Attachment 4)
Environmental Planning Commission (EPC) – 9/18/2013 Issues and Opportunities Staff Report
Meeting Notes (See Attachment 2)
Other City Projects

Planning Division Update
Check the “Announcements” for up-to-date information on city-wide planning efforts.

San Antonio Precise Plan (in progress)
Plan to rebuild and strengthen the San Antonio Center and encourage a phased development that promotes viability and coordination of the Center.
Currently running in parallel with the El Camino Real Precise Plan process.

North Bayshore Precise Plan (in progress)
A plan to allow for more sustainable and innovative development, a complementary mix of land uses and open space, improved mobility and strategies to address sea level rise for the area north of Highway 101.

Mountain View Pedestrian Master Plan (2013)
Goals and policies for improving the pedestrian environment in Mountain View.

Bicycle Transportation Plan (2008)
Overview of existing bikeways and bicycle support facilities and planned improvements to entire bikeway system.
Comprehensive updates will start this winter and are detailed in the 2013-14 Captial Improvement Program.

Other Capital Improvements

  • California Street Corridor Study
  • Shoreline Transportation Study

Other Related Projects

Grand Boulevard Initiative
Regional collaboration dedicated to revitalization of the El Camino Real corridor running through San Mateo and Santa Clara Counties.

El Camino Real BRT Project
Upgrade of VTA’s Route 522 along El Camino Real from San Jose to Palo Alto. Improvements include reduced headways and travel times, station ticketing and other station upgrades, and upgraded buses. A dedicated lane for buses is being studied but may not be implemented in Mountain View.

Both comments and pings are currently closed.